top of page

Fitokitchen Grubu

Herkese Açık·6 üye
Albert Butchers
Albert Butchers

Cement Engineers Handbook


Along with supporting the casing in the wellbore, the cement is designed to isolate zones, meaning that it keeps each of the penetrated zones and their fluids from communicating with other zones. To keep the zones isolated, it is critical to consider the wellbore and its properties when designing a cement job.




Cement Engineers Handbook



The depth of the well influences the amount of wellbore fluids involved, the volume of wellbore fluids, the friction pressures, the hydrostatic pressures, the temperature, and, thus, the cement slurry design. Wellbore depth also controls hole size and casing size. Extremely deep wells have their own distinct design challenges because of high temperatures, high pressures, and corrosive fluids.


The geometry of the wellbore is important in determining the amount of cement required for the cementing operation. Hole dimensions can be measured using a variety of methods, including acoustic calipers, electric-log calipers, and fluid calipers. Openhole geometry can indicate adverse (undesirable) conditions such as washouts. Wellbore geometry and casing dimensions determine the annular volume and the amount of fluid necessary.The hole shape also determines the clearance between the casing and the wellbore. This annular space influences the effectiveness of drilling-fluid displacement. A minimum annular space of 0.75 to 1.5 in. (hole diameter 2 to 3 in. greater than casing diameter) is recommended. Annular clearances that are smaller restrict the flow characteristics and generally make it more difficult to displace fluids.Another aspect of hole geometry is the deviation angle. The deviation angle influences the true vertical depth and temperatures. Highly deviated wellbores can be challenging because the casing is not as likely to be centered in the wellbore, and fluid displacement becomes difficult.Problems created by geometry variations can be overcome by adding centralizers to the casing. Centralizers help to center the casing within the hole, leaving equal annular space around the casing.


The temperatures of the wellbore are critical in the design of a cement job. There are basically three different temperatures to consider: the bottomhole circulating temperature (BHCT), the bottomhole static temperature (BHST), and the temperature differential (temperature difference between the top and bottom of cement placement). The BHCT is the temperature to which the cement will be exposed as it circulates past the bottom of the casing. The BHCT controls the time that it takes for the cement to setup (thickening time). BHCT can be measured using temperature probes that are circulated with the drilling fluid. If actual wellbore temperature cannot be determined, the BHCT can be estimated using the temperature schedules of American Petroleum Inst. (API) RP10B.[1] The BHST considers a motionless condition where no fluids are circulating and cooling the wellbore. BHST plays a vital role in the strength development of the cured cement.The temperature differential becomes a significant factor when the cement is placed over a large interval and there are significant temperature differences between the top and bottom cement locations. Because of the different temperatures, commonly, two different cement slurries may be designed to better accommodate the difference in temperatures.The bottomhole circulating temperature affects slurry thickening time, rheology, fluid loss, stability (settling), and set time. BHST affects compressive-strength development and cement integrity for the life of the well. Knowing the actual temperature that the cement will encounter during placement allows operators to optimize the slurry design. The tendency to overestimate the amount of materials required to keep the cement in a fluid state for pumping and the amount of pumping time required for a job often results in unnecessary cost and well-control problems. Most cement jobs are completed in less than 90 minutes.To optimize cost and displacement efficiency, the guidelines discussed next are recommended. Design the job on the basis of actual wellbore circulating temperatures. A downhole temperature subrecorder can be used to measure the circulating temperature of the well. A subrecorder is a memory-recorder device that can either be lowered by wireline or dropped into the drillpipe and measures the temperature downhole during the circulating operation before cementing. The memory recorder is then retrieved from the drillpipe and the BHCT is measured. This allows for accurate determination of the downhole temperature.


Most primary cement jobs are performed by pumping the slurry down the casing and up the annulus; however, modified techniques can be used for special situations. These techniques are cementing through pipe and casing (normal displacement technique), stage cementing (for wells with critical fracture gradients), inner-string cementing through tubing (for large-diameter pipe), outside or annulus cementing through tubing (for surface pipe or large casing), reverse-circulation cementing (for critical formations), delayed-set cementing (for critical formations and to improve placement), and multiple-string cementing (for small-diameter tubing).


Conductor, surface, protection, and production strings are usually cemented by the single-stage method, which is performed by pumping cement slurry through the casing shoe and using top and bottom plugs. There are various types of heads for continuous cementing, as well as special adaptors for rotating or reciprocating casing.


Stage cementing is used to ensure annular fill and seal across selected intervals whenever a continuous single-stage, lead and tail, or lightweight (foamed, ceramic spheres, etc.) cementing application cannot be performed. Stage-cementing tools, or differential valve (DV) tools, are used to cement multiple sections behind the same casing string, or to cement a critical long section in multistages. Stage cementing may reduce mud contamination and lessens the possibility of high filtrate loss or formation breakdown caused by high hydrostatic pressures, which is often a cause for lost circulation.Stage tools are installed at a specific point in the casing string as casing is being run into the hole. The first (or bottom) cement stage is pumped through the tool to the end of the casing and up the annulus to the calculated-fill volume (height). When this stage is completed, a shutoff or bypass plug can be dropped or pumped in the casing to seal the stage tool. A free-falling plug or pumpdown dart is then used to hydraulically set the stage tool and open the side ports, allowing the second cement stage (top stage) to be displaced above the tool. A closing plug is used to close the sliding sleeve over the side ports at the end of the second stage and serves as a check valve to keep the cement from U-tubing above and back through the tool.The displacement stage-cementing method is used when the cement is to be placed in the entire annulus from the bottom of the casing up to or above the stage tool. The displacement method is often used in deep or deviated holes in which too much time is needed for a free-falling plug to reach the tool. Fluid volumes (mud, spacer, cement) must be accurately calculated and prepared on locations and densities closely measured to prevent over- or underdisplacement of the first stage. Overdisplacement can result in improper opening of the tool to apply the second (upper) stage, resulting in excess pressures or job failure. Underdisplacement creates a gap (void) in the cement column at the stage tool, which results in poor zonal isolation. Two-stage cementing is the most widely used multiple-stage cementing technique. However, when a cement slurry must be distributed over a long column and hole conditions will not allow circulation in one or two stages, a three-stage method can be used. The same steps are involved as in the two-stage methods, except that there is an additional stage. Obviously, the more stages used in the application, the more complicated the job will become. Although stage cementing was very popular many years ago, new foamed-cement and nonfoamed-ultralightweight-cement technologies have successfully reduced the need for multistage cementing in many operations.


When large-diameter pipe is cemented, tubing or drillpipe is commonly used as an inner string to place the cement. This procedure reduces the cementing time and the volume of cement required to bump the plug. The technique uses modified float shoes, guide shoes, or baffle equipment, with sealing adaptors attached to small-diameter pipe. Cementing through the inner string permits the use of small-diameter cementing plugs. If the casing is equipped with a backpressure valve or latchdown baffle, the inner string can be disengaged and withdrawn from the casing as soon as the plug is seated, while preparations are made to drill deeper.


A method commonly used on conductor or surface casing to bring the top of the cement to the surface consists of pumping cement through tubing or small-diameter pipe run between casings or between the casing and the hole. This method is sometimes used for remedial work. Casing can suffer damage when gas sands become charged with high pressure from surrounding wells. In such instances, cementing the annulus between strings through a casinghead connection can repair the casing.


The reverse-circulation cementing technique involves pumping the slurry down the annulus and displacing the drilling fluid back up through the casing. The float equipment, differential fill-up equipment, and wellhead assembly must be modified. This method is used when the cement slurry cannot be pumped in turbulent flow without breaking down the weak zones above the casing shoe. Reverse circulation allows for a wider range in slurry compositions, so heavier or more-retarded cement can be placed at the lower portion of casing, and lighter or accelerated cement can be placed at the top of the annulus. Caliper surveys should be made before the casing is run, to determine the necessary volume of cement and minimize overplacement. 041b061a72


Hakkında

Gruba hoş geldiniz! Diğer üyelerle bağlantı kurabilir, günce...

Üye

bottom of page